FAQ

What is Wet Pour?

Small granules of ground up rubber, mixed with an Ethylene Propylene Diene Modified soft resin compound, the resulting mixture is then “poured”.

How is the ground prepared?

A solid, well drained base of accurate size is dug out, then base layers laid to support the Wetpour. Flush curbs may be installed to eliminate trip hazards.

How long will wet pour installation take?

Usually between 1 day and 1 week. This will depend on the area size, depth of the surface to be installed and complexity of the artwork.

Contact Us

Book your Bounceback installation now!

Pin It on Pinterest

Share This