The wetpour multilayer process
How long will installation take? This will depend on the area size, depth of surface to be installed and complexity of the artwork but usually between 1 day and 1 week. How soon can I use the surface? The following day. Our installation team will remain with the surface until it has cured and is safe to leave. What areas of the UK do we cover? Our products and services are available UK wide, England, Scotland and Wales. We will travel to install a BounceBack surface. How is the ground prepared? The ground must prepared to give a base of an accurate size with a suitable curb edging which the surfacing will adhere to. The sub-base must finish the correct depth below the top of the curb edging to accommodate the required thickness of the BounceBack surface. Good drainage is vital. The longevity of the surface will be affected if water cannot escape from the base. We are happy to advise on any sub-base preparation, which should take into account local site conditions. A solid sub-base, either MOT Stone, Base-Course Tarmac or Non-fines Concrete should be installed as this will ensure good drainage. We are also able to install BounceBack onto existing tarmac and flagged surfaces. The BounceBack surface is then installed directly onto this base, finishing flush with the top of the curb edges, thus eliminating any trip hazards. How do we install the safety surface? Our installation process depends on preparation of the ground and installation of any fitments for play equipment. When the ground is prepared to the agreed specification with a free draining sub-base we:
|
Safety Surfaces - Wetpour Safety Sufacing - Rubberised Safety Surfacing - School Playground |